32.5 C
Kuala Lumpur
Friday, May 9, 2025
HomeNewsIn Eastern China, the Canadian LNG plant's final modules have been built.

In Eastern China, the Canadian LNG plant’s final modules have been built.

Date:

Related stories

Penang Hill cable car project on track, first tower to rise by June

The much-anticipated Penang Hill cable car project is progressing...

No tolerance for housing misuse, says Penang housing exco

No tolerance for housing misuse, says Penang housing exco The...

One Mutiara | Penang Property Talk

One Mutiara One Mutiara, a proposed affordable housing development by...

Taman Ara Damai – A new chapter of modern living in Tasek Gelugor

Step into a refreshing lifestyle at Taman Ara Damai,...

Penang ranked 4th as unsold homes nationwide exceed RM13.9 billion

As of late 2024, Malaysia recorded a total of...

Qingdao City, Shandong Province, east China, with the delivery of the final two modules out of 35.

According to a report by the China News Service, the project was constructed by the Offshore Oil Engineering Co., Ltd. under the China National Offshore Oil Corporation, and it was the first integrated construction LNG modular plant to be delivered (CNS).

Shell, a British oil and gas corporation, and four other multinational oil companies have invested jointly in the project.

When operational, the project is anticipated to provide high-quality clean energy to nations like China with an annual output of 14 million tonnes of LNG.

According to the CNS, the maximum module weight is above 8,200 tonnes, which is greater than the metal frame of the Eiffel Tower, which weighs 7,300 tonnes.

Click HERE to read more.

Source: CGTN

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

LEAVE A REPLY

Please enter your comment!
Please enter your name here